
Modular Equipment & Prefabricated Systems for Passive House Construction
Monday, October 20, 2025 (12:00 PM - 1:00 PM) (EDT)
Description
Join us in learning how modular equipment and prefabricated systems can reduce construction costs and simplify mechanical design for Passive House projects. Modular and prefabricated mechanical heat pump systems offer architects and engineers ways to minimize the floorspace requirements associated with heating, cooling, and domestic hot water. These space savings are especially important here in New York City, where floorspace is at a premium. Prefabricated systems also minimize costly delays in the field while installing equipment – no more finger-pointing on-site when the pipes don’t line up or power cables don’t reach.
Speakers
Drew Maggio joined HIGHMARK as Technical Director in 2023 and has since played a pivotal role in augmenting the business. He has strengthened HIGHMARK’s presence and partnerships through his strategic engagement with industry groups such as NESEA, NY-Geo, and NY Passive House. Additionally, he ensures that NYSERDA is aware of HIGHMARK’s manufacturer’s capabilities, securing funding and development opportunities to drive innovation. He supports HIGHMARK and it’s manufacturing partners in special projects and evaluating novel technologies in the HVAC and Plumbing industry.
- AIA Credits: 1 LU/HSW - TBD
- PHI Credits: 1 LU - TBD
- PHIUS Credits: 1 LU - TBD
Free Webinar
1 See Attendee List